1919 Market Street in Oakland, California was a warehouse targeted for conversion to mixed-use commercial and residential development. Calichi provided site civil engineering services from initial entitlement through construction, covering on-site improvement plans and public encroachment permits for work in the City right-of-way.
Our scope included civil planning entitlement documents, full civil improvement plans with grading and drainage design to Alameda County C.3 stormwater standards, a SWPPP, sanitary sewer and drainage reports, and a P-Job off-site encroachment permit set. We completed a topographic and boundary survey and coordinated LEED Silver equivalency research as part of the civil scope. Value engineering support during construction document production and construction phase services rounded out the civil engagement.
Alongside the civil work, we processed a lot line adjustment, tentative map, and final map to reconfigure the parcels as part of the conversion. The final map was recorded in 2019, closing out the mapping work that began alongside the entitlement submittals.