Skip to contentSkip to content

CaliChi Design Group

  • Services
    • InfraWorks/3D Modeling Narrative
  • Why CaliChi
  • Projects
  • Our Story
  • Oakland Civil Engineer | Calichi Design Group — Bay Area Site Civil & Dry Utility Engineering
  • Our Team
  • Careers
  • Civil Engineering Services in Walnut Creek, CA
  • News
  • Civil Engineering Services in Sacramento, CA
  • Joint Trench Design & Dry Utility Consulting
  • Contact
  • Civil Engineering Services in San Francisco, CA
  • Privacy
  • Terms
  • Sitemap
  • Domestic Water System Design in Oakland
  • Home
  • Fire Flow Analysis for Portland, Oregon Projects
  • SWPPP Design & Stormwater Management — Bay Area
  • Sanitary Sewer System Design — Portland
  • Site Civil Engineering Services — Hood River
  • Locations
  • Thank You
  • Site Civil Engineering for Land Development
  • Blog
    • Soil Import and Export: How to Estimate Haul Costs
    • Soil Nail Wall vs. Retaining Wall: Choosing the Right System — Calichi Design Group
    • Specific Plan vs. General Plan — Calichi Design Group
    • Storm Drain Pipe Sizing Using Manning’s Equation
    • Bioretention Isn’t Always the Answer. But It’s Always the…
    • Stormwater Calculations: Rational Method vs. TR-55
    • How to Write a Stormwater Control Plan That Doesn't Come Back…
    • Portland Stormwater Management: BES, PSMM, and Why Your…
    • Stormwater Quality vs. Quantity: What Agencies Actually Require
    • Subgrade Preparation: What Inspectors Look For
    • Subsurface Detention Systems: StormTech, CDS, and Underground Vaults
    • How to Design a Drainage Swale
    • Switchgear Pads and Pull Boxes: The Equipment Nobody Draws…
    • SWPPP Requirements and Risk Level Determination
    • Tentative Map vs. Parcel Map vs. Lot Line Adjustment
    • Testing and Inspection Requirements During Grading
    • Tract Map vs. Parcel Map: Which Subdivision Map Do You Need? — Calichi Design Group
    • Transformer Pad Clearances: The 10 Feet Nobody Planned For
    • Trench Drain Selection and Sizing — Calichi Design Group
    • Truncated Domes: Placement Rules and Common Mistakes
    • Underground Service Alert (USA) and Potholing Requirements
    • Utility Potholing Before Construction — Calichi Design Group
    • Utility Trench Backfill and Compaction Requirements
    • V-Ditch vs. Swale: When to Use Each — Calichi Design Group
    • Value Engineering on Civil Projects: Where to Cut and Where Not To
    • Van Accessible Parking Stalls: Dimensions, Access Aisles, and…
    • Variance vs. Conditional Use Permit — Calichi Design Group
    • Half an Inch Across 200,000 Square Feet: Warehouse Grading Is…
    • How Do You Size a Water Main for Fire Flow?
    • How to Size a Water Meter for Commercial Buildings
    • Water Main Pressure Testing Requirements
    • What Is a Will-Serve Letter and Why Your Project Can't Move…
    • What Is C.3 Stormwater? A Plain-English Explanation for…
    • Accessible Parking: Schools vs. Commercial vs. Residential
    • Accessible Route Design for Campuses and Large Sites
    • How Flat Is Too Flat? The ADA-vs-Drainage Problem That Haunts…
    • How to Calculate ADA Parking Requirements
    • ADA Path of Travel: Maximum Slopes, Landing Sizes, and…
    • Every Sidewalk, Every Ramp, Every Cross-Slope: ADA on a…
    • 2% Cross-Slope: The Three Characters That Make Affordable…
    • Affordable Housing Site Planning in California: TCAC, C.3,…
    • Fitting a Bioretention Basin on a Half-Acre Lot Is Like…
    • Appendix B vs. Appendix C Fire Flow: When Each Applies
    • As-Built Drawings: What They Need to Show and Who Prepares Them
    • When Is a Backflow Preventer Required?
    • Why Bay Area K-12 Projects Need Stormwater-First Site Planning
    • Bay Area Mixed-Use Projects: The Site Planning Challenges…
    • Bay Area Multifamily Site Planning: C.3 Compliance and Beyond
    • Bike Lockers vs. Bike Racks: What Your City Actually Requires
    • How to Set a Building Pad Elevation
    • Building Permit vs. Grading Permit: What Is the Difference? — Calichi Design Group
    • CALGreen EV Charging: EV Ready, EV Capable, and EVSE
    • CBC 11B on Schools: The Plan Check Comments That Follow You Home
    • What Is a CEQA Exemption and When Does It Apply?
    • Compaction Testing Requirements and Frequency — Calichi Design Group
    • Composite Utility Plans: The Drawing That Saves Your Project…
    • Conditions of Approval: How to Read Them and What They Cost
    • Construction Staking: What the Surveyor Needs from Your Plans
    • Cost Estimating for Site Civil Work: Rules of Thumb
    • Curb and Gutter Types: Rolled, Barrier, and Mountable
    • Cut and Fill Earthwork Calculations Explained
    • Density Bonus: When the City Hands You 40 Extra Units and…
    • Detention vs. Retention: Which Your Project Needs
    • Does My Project Trigger C.3? The Square Footage Thresholds…
    • Does My Project Trigger C.3? It’s Not One Threshold Anymore
    • Why Dry Utility Coordination Takes Longer Than You Think (And…
    • Dry Utility Design for Multifamily Projects: Trenches,…
    • How Long Does DSA Really Take? Grab a Chair.
    • Electrical Vaults: Sizing, Placement, and Why They Always End…
    • Encroachment Permits: What They Cover and Who Needs One
    • Environmental Impact Report Timeline and Process — Calichi Design Group
    • Erosion and Sediment Control BMPs During Construction
    • Fiber Optic Conduit Requirements for New Development
    • Fire Access Road Requirements: Width, Turning Radius, and the…
    • Fire Department Turnarounds: Hammerhead vs. Cul-de-Sac and…
    • Fire Flow Calculations: What the Fire Code Actually Requires
    • Fire Hydrant Spacing Requirements by Building Type
    • Fire Sprinkler Demand vs. Fire Flow: Separate Calculations
    • Gas Main Extensions: Who Pays and How Long It Takes
    • Geogrid Soil Reinforcement: When and How to Use It — Calichi Design Group
    • Geotechnical Report Basics: What Civil Engineers Need from It
    • Grading Permit Thresholds by Jurisdiction
    • How to Size a Grease Interceptor
    • Green Infrastructure vs. Gray Infrastructure for Stormwater
    • HECO vs. PG&E: Comparing Hawaii and California Utility Processes
    • How to Calculate ADA Parking Requirements (With the Table…
    • How to Calculate Bike Parking Requirements (Short-Term vs….
    • How to Calculate EV Parking Requirements in California…
    • How to Read a Grading Plan: Contours, Spot Elevations, and…
    • How to Size a Bioretention Basin: The 4% Rule and When It…
    • Hydromodification: The Word Your Client Can't Pronounce but…
    • Improvement Plan Requirements for New Development — Calichi Design Group
    • Industrial Dry Utility Design: When Your Power Demand Is the…
    • Your Fire Marshal Just Red-Lined Your Site Plan. Here's Why…
    • 40 Acres of Concrete and Nowhere for the Rain to Go
    • Your Entire Site Is Impervious. Your Stormwater Engineer Just…
    • Joint Trench Design: What Every Developer Needs to Know…
    • Joint Trench and Dry Utility Design in Portland: PGE, Pacific…
    • K-12 School Site Planning in Honolulu: Drainage, Grading, and…
    • K-12 Site Planning in the Pacific Northwest: Rain, Terrain,…
    • Knox Box and FDC Placement Requirements
    • LID (Low Impact Development) Principles Explained
    • Can a Playground Be a Stormwater Basin? Turns Out, Your Kids…
    • Lot Merger vs. Lot Line Adjustment — Calichi Design Group
    • Mass Timber Buildings: Civil Engineering Considerations
    • Maximum Driveway Slopes in California: What the Code Says and…
    • Mixed-Use Site Planning in Honolulu: Balancing Density with…
    • Planning a Mixed-Use Project in Hood River? Start with the Site
    • MS4 Permit Compliance for Small Municipalities
    • Multifamily Site Planning in the Pacific Northwest: What…
    • Multifamily Site Planning in Walnut Creek: Parking, Grading,…
    • Oakland Mixed-Use Site Planning: Navigating Entitlements and…
    • What Oakland Developers Need to Know About Multifamily Site Plans
    • Parking Lot Grading and Drainage Design
    • When Does an Existing Building Trigger Path of Travel Upgrades?
    • Pavement Section Design: Asphalt vs. Concrete for Site Work
    • Peer Review: What to Look for When Reviewing Another Engineer’s Plans
    • Pervious Pavement: Types, Maintenance, and Limitations
    • The PG&E Green Book: A Civil Engineer's Translation Guide
    • The PG&E Green Book: A Civil Engineer’s Translation Guide
    • PG&E's New Joint Trench Process: Submit Your Building Permit…
    • Rule 16 vs. Rule 20 vs. Rule 21: PG&E Service Extensions Explained
    • How Long Does a PG&E Service Extension Actually Take?
    • Portland Multifamily Site Planning: Stormwater, Density, and…
    • Who Maintains Private vs. Public Sewers?
    • Provision C.3: The Three Pages of Permit Language That…
    • Public Improvement Bond Requirements for Developers — Calichi Design Group
    • Rain Gardens vs. Bioretention: Is There a Difference?
    • How to Respond to Plan Check Comments Efficiently
    • Retaining Wall Types and When Each Is Appropriate
    • Rough Grading Certification Process — Calichi Design Group
    • How to Navigate Sacramento's Multifamily Site Planning Process
    • Sacramento Retail Site Planning: Utilities, Access, and City…
    • Sanitary Sewer Design: Minimum Slopes and Pipe Sizing
    • SB 35 Streamlining: What It Actually Means for Your Civil…
    • Nobody Budgeted the Civil Scope: A School Modernization…
    • How to Evaluate Existing Sewer System Capacity
    • When Does a Sewer Lateral Need to Be Replaced?
    • Sidewalk Design: Width, Scoring, Ramps, and Common Mistakes
    • Silva Cells: When Your Stormwater Solution Grows a 50-Foot Tree — Calichi Design Group
    • Site Grading: Reading Contours and Setting Pad Elevations
    • What Are C.3 Stormwater Requirements? A Bay Area Project Guide
    • Small-Town School Site Planning: Lessons from Hood River, Oregon
    • What Is a Tentative Map? A California Subdivision Guide
    • Site Planning for Oakland Schools: DSA, Playgrounds, and ADA…
    • Building Better Schools in Portland: A Civil Engineer's Guide…
    • What Sacramento School Districts Need from a Civil Site Plan
    • What Are C.3 Stormwater Requirements? A Bay Area Project Guide
    • How Does Site Planning for K-12 Schools Work in Walnut Creek?
    • What Is a Tentative Map? A California Subdivision Guide
    • Site Planning for Honolulu Multifamily Projects: Slopes,…
    • Multifamily Housing in Hood River: Site Planning for a…
    • Mixed-Use Site Planning Across the Pacific Northwest:…
    • How Portland's Green Infrastructure Rules Shape Mixed-Use…
    • Retail and Mixed-Use Site Planning in Walnut Creek: What the…
    • Slope Stability Considerations for Hillside Development
    • Stormwater Requirements for Small Projects: Yes, Your 5,000…
  • SLBE-Certified Civil Engineer | CaliChi Design Group
    • SLBE Certified Civil Engineering — Oakland & Alameda County
    • Calichi SLBE Bid Package — One-Page Reference for Prime Contractors
  • CaliChi – Portland
  • Construction Administration Services
  • CaliChi – Hood River
  • CaliChi – Hawaii
  • Site Planning
  • Geotechnical Site Investigation
  • Stormwater Low Impact Development
  • Stormwater Management
  • Fire Flow Studies
  • Civil Engineering Subconsultant for California Firms
  • Utility Research and Coordination, California
  • Library
  • Bay Area Civil Engineering by a California PE — Calichi Design Group
  • Site Development Engineering for Subdivisions, Commercial & Multifamily — Calichi
  • C.3 Stormwater Compliance for Bay Area Projects — Calichi Design Group
  • Dry Utility Consulting

Site Planning

Affordable Housing Site Planning: TCAC, C.3 & Civil Design Integration

May 8, 2026 by Reco Prianto, PE

TCAC requirements, density bonuses, and civil design for affordable housing. Strategic site planning for success.

Categories Specialized Projects Tags Affordable Housing, Site Planning, TCAC
© 2026 CaliChi Design Group • Built with GeneratePress
Wondering what civil engineering costs? See our fee structure.