Site Development Engineering for Subdivisions, Commercial, and Multifamily
From entitlement-ready site plans through construction administration. Calichi Design Group is a California-licensed civil engineering firm delivering site development packages for Bay Area developers, architects, and public agencies.
From feasibility to as-built
The five phases of a Bay Area site development project. We can engage at any stage — most clients bring us in at Phase 1 or Phase 2.
Feasibility
Site analysis, due diligence, conceptual yield study, jurisdictional code review.
Entitlement
Tentative map, site plan review, conditional use permit, environmental clearances.
Improvement Plans
Grading, drainage, stormwater (C.3), utilities, ADA — PE-stamped at 50 / 90 / 100%.
Permitting
Bureau of Building plan check, EBMUD/PG&E coordination, encroachment permits.
Construction
Construction admin, RFI response, shop drawings, field verification, as-built drawings.
Recent site development work
Real projects, real plan check cycles, real outcomes — from tight East Bay infill to multi-acre OUSD campuses.
Fremont High School Net-Zero Campus
12-acre OUSD campus rebuild. Net-zero energy, 40-foot retaining walls, full C.3 stormwater treatment, all utilities on site.
95th & International Multi-Family
Affordable housing with ground-floor La Clínica de La Raza health clinic on a tight East Oakland infill site.
Dublin Transit Center Parking Garage
First design-build project in Alameda County since 2017. Transit-oriented parking with full civil package.
Have a Bay Area site that needs civil engineering?
Send us the site, scope, and schedule. We’ll return a fixed-fee proposal within five business days.